One Team From Truss to Last Show
Our engineers rig the truss, programme the waves and run the ceiling on site. Nobody new joins the job between survey and dismantle.

Kinetic Ceiling · Dubai & GCC
Lazulite rents and builds the Kinetic Ceiling, an overhead array of LED panels hung on actuators and metal strings. Every panel rises and falls on its own, so the array ripples in waves timed to its video. We rig it on a truss over stands, stages, stores and lobbies across the Gulf.
Wave pass
Overhead view
String detailQuick facts
A kinetic ceiling is a suspended display whose parts move up and down on motors while showing light or video. Lazulite's version hangs LED panels from actuators, so the screen itself changes shape overhead.
12+
Kinetic Ceiling Installations
70+
Wave Routines Choreographed
9+
Retail and Mall Placements
350+
Hours of Overhead Motion Run
A booking covers the panel array, its truss, the motion controller and media playback. We add transport, rigging, a programmed routine, an engineer through the event and the dismantle.
Each LED panel hangs from metal strings driven by its own actuator. The controller sends every actuator a height, so neighbouring panels can lift and drop out of step. That offset is what turns a flat screen into a rolling wave.
The array shows 960 by 704 pixels at a 2.5 mm pixel pitch. Video arrives over HDMI and movement data over LAN. The panels travel within a one metre band below the truss.
The ceiling plays MP4 files. Our designers render video and motion on one timeline, so a colour sweep can ride the crest of each wave. Water, wind, sound waves and brand patterns read well from below.
Choose a configuration

Exhibition Stand Canopy
The array hangs above the stand so the moving light marks your space from far down the aisle. Visitors walk under it into the stand.
Key features
Typical uses
| Type | Suspended kinetic LED ceiling display |
|---|---|
| Structure | 3,000 by 1,140 by 5,276 mm overall |
| Motion | Panels on actuators and strings, one metre of travel |
| Display | 2.5 mm pixel pitch, 960 by 704 pixels |
| Content | MP4 video over HDMI |
| Control | Movement over LAN; 2.4 GHz network listed |
| Interaction | None, it runs a programmed show |
| Power and setup time | About 7.36 kW on one 32 amp single-phase circuit; a one to two day build |
These figures come from the current unit. We recheck height, truss and power against your venue during the survey.
Delivered at

Lazulite's own kinetic design, with blocks turning in sync to a programmed pattern, much as the ceiling panels follow theirs.

At GITEX 2021, du's stand used a Lazulite volumetric LED display that gave content real depth.

A permanent centre where visitors explore interactive maps and data visuals daily, much like a lobby placement of the ceiling.
A rental covers the array, truss, controller, a routine set to your content and an engineer. Runs can last a single evening or several months.
A custom build can change the finish, truss cladding or routine library around your brand. Array size and footprint changes are open questions we answer per brief.
We usually rig the truss and array the day before opening, then test the full routine that evening. Dismantling needs a separate slot agreed with the venue.
Our engineers rig the truss, programme the waves and run the ceiling on site. Nobody new joins the job between survey and dismantle.
Lazulite has worked across all six GCC countries from its Dubai Production City base. Our crews know how halls approve hung and truss-mounted pieces.
Every routine plays on the complete array in our Dubai workshop before it leaves. Actuators, strings and panels are serviced by our own technicians.

Trusted by: Brands, Retailers, Agencies, Venue owners












We measure clear height, truss positions, load-in routes and the power point before design begins.
Our team scripts panel heights and renders MP4 content at 960 by 704 pixels on one timeline.
You watch the complete routine on the array in our workshop and approve it before dispatch.
Engineers raise the truss, hang the array, test every actuator and stay to run each show.
We lower and pack the panels, then share a note on running hours and any service points.
The structure measures 3,000 by 1,140 mm and stands 5,276 mm tall. Keep a clear zone below the moving band and room around the base for lifting during the build.
Order one single-phase 32 amp supply, close to 7.36 kW. HDMI carries the video, LAN carries the panel heights, with 2.4 GHz wireless named on the sheet.
The ceiling is truss-mounted and needs the truss for support. Venues receive our drawings and load figures for approval before the build day.
Avoid skylights and hard spotlights aimed at the panels. Our crew confirms goods lifts, doorways and delivery slots with halls in Dubai, Riyadh and Doha.
Our estimate for a rented ceiling with truss, standard routine and engineer is AED 15,000 to 30,000 a show day, before VAT.
Show days, programming time, bespoke video and venue access set most of the cost. Long retail or lobby placements carry a lower daily rate.
Extra wave routines, 3D animation, late finishes and a second engineer each appear as their own quote line.
Most ceiling projects sit in one of the three bands below. Share the venue, dates and run length for a costed range.
Budget bands
Compact
One ceiling, one event
Standard
A routine set to your brand
Flagship
A ceiling built for your space
Rent vs custom
| Metric | Rent | Custom build |
|---|---|---|
| Speed to launch | Higher | Lower |
| Upfront investment | Lower | Higher |
| Brand uniqueness | Lower | Higher |
| Reuse value | Lower | Higher |
Rent
Proven array, faster start
Custom build
An overhead piece you own
The Kinetic Ceiling hangs overhead and moves panels up and down on strings. Kinetic DNA stands on the floor and turns its modules into a helix that people walk around.
Choose it when floor space is precious, as in a store or a packed stand. It also suits rooms viewed from below or from a mezzanine.
Choose the helix when a single column should anchor the room and visitors can circle it. It needs a smaller base and less overhead structure.
Ask where people will look and how much floor you can spare. Looking up with a full floor points to the ceiling; walking around points to the helix.
Can't find your answer? Speak with our Dubai team.
Each LED panel hangs on metal strings from its own actuator. A controller sends every actuator a height over LAN, while video arrives over HDMI. Because panels move independently, the array forms waves and fluid shapes within one metre of travel. Motion always stays in step with the MP4 content.
Let's build it together
Tell us the venue, clear height, dates and the story you want overhead. Our Dubai team will send a placement plan, a routine outline and an indicative budget for the Kinetic Ceiling. The engineers who survey your space also rig and run the array. Reach us by phone, WhatsApp or email.
Let's Discuss Your Project