Contractor Registration and Site Passes
ADNEC asks every stand contractor for a full plan pack before build-up. At ADIS 2026 that meant drawings, structural calculations, a method statement, a risk assessment, insurance, a trade licence and a bond. Safety boots and high-visibility vests are mandatory on the floor.




